Year-End Truck Allocation 2026: 10 Units, December Vessel

Ten units from current stock, reserved for the December vessel: HOWO 371 and 400hp dumps, Shacman F3000 450 tractors, HOWO TX tractors. Third-party inspection and a first-service kit included. 30 percent deposit by 30 November, delivery to Tema, Lome, Abidjan and Dakar inside the January dry-season window.

Year-End Truck Allocation 2026: 10 Units, December Vessel

Black Friday is a retail holiday. A 12-tonne dump truck is not an impulse purchase, and nobody in Tema or Abidjan is waiting for a percentage off the sticker. So this page is not a discount event. It is a stock release: ten units from current inventory, reserved for buyers who can commit to the December vessel, with the inspection, the loading window and the delivery dates written down instead of promised in a chat.

What is in the allocation

Ten units, drawn from stock we physically hold in the yard and inspect before loading. Four lines cover most West African duty cycles. The 371hp HOWO 6x4 dump truck (spec sheet here) is the volume workhorse for site and mine waste work - the configuration most contractors in Ghana and Cote d'Ivoire benchmark against. The Shacman F3000 450hp tractor (F3000 450 details) handles corridor freight on the Lagos-Ouagadougou and Abidjan-Bamako routes. The HOWO TX 371 tractor (TX 371 page) suits fleets that standardize on Weichai parts and want one engine family across the yard. And the 400hp HOWO dump with the reinforced body (400hp dump listing) is for operators who need more body volume and a heavier structure than the standard 371. Every unit ships with a third-party inspection report and a first-service kit of filters and belts.

How the reservation works

Three steps, no auction. One: tell us the unit and the destination port; we send the spec sheet, the inspection report and a CIF quote against that port. Two: a 30 percent deposit by 30 November locks the unit and the vessel slot. Three: loading within seven working days of deposit, with the bill of lading, invoice, packing list and certificate of origin issued before sailing. The balance is due against the documents, as our after-sales and payment checklist sets out. We do not take deposits on units we have not inspected, and we do not promise a sailing date we have not booked.

Why the December vessel, and why the deadline is 30 November

Two clocks run at the same time. The first is the West African dry season: from November to April, construction and mine haulage fleets actually mobilize, and a truck that lands in January starts earning in the best window of the year - the demand pattern we mapped for Mali and Guinea. The second is the Chinese Spring Festival in early February, when factories, body builders and inspection crews slow down for two to three weeks; cargo booked after mid-December tends to slip into March. A December sailing avoids both problems. Typical transit to Tema and Abidjan runs 35 to 45 days, with Lome and Dakar in a similar band - confirm the exact rotation at booking, because vessel space in Q4 tightens and the numbers move.

What this is not

It is not a price cut, and it is not a clearance of trucks that failed inspection. The ten units are ordinary stock at ordinary prices; the value is certainty - a known unit, a known inspection, a booked slot and documents that clear. Price is quoted one to one against your port because CIF depends on the vessel, the destination and the season. Benchmark any quote against our 2026 FOB price table before you compare offers, and check the destination rules that apply to your market in our Tema versus Lome guide and the corridor overview.

Questions buyers ask this week

Can I switch models after the deposit? Yes, once, if the replacement unit is in the same allocation and the vessel slot allows it. What if the vessel slips? You get the next available sailing at the same freight, or the deposit back in full - your choice, in writing. Do you handle clearance at destination? We work with established clearing agents in Tema, Lome, Abidjan and Dakar and can introduce ours; the duty stack stays your contract with the agent.

How to start

WhatsApp the export team: +86 184 5478 7666 - send the model and the port, and ask for the allocation list (reference BF26-SITE). The reply window is 24 hours. If you are still choosing between a dump and a tractor, read the Mali and Guinea demand pieces first - they explain which fleets are buying and why. Then compare parts depth in our West Africa parts map before you commit to a brand. The allocation closes on 30 November, or earlier if the ten units go first.